continuous discovery
why
an assumption validated after the build is the most expensive way to learn it was wrong: no significant build starts before its question survives the cheapest probe that can falsify it. discovery as a front-loaded phase decays into opinion between projects; as a weekly habit it keeps real-visitor evidence flowing into prioritization. a one-hour probe routinely saves weeks of unwanted build.
rule
discovery is not a phase before building; it is a small continuous activity beside delivery. every week answers at least one open product question through the cheapest probe that can answer it. a question answered after a launch is an expensive answer.
interview discipline
- ask about past behavior and current pain, never hypothetical willingness ("would you use...").
- record answers in the visitor's words; translate into feature names only with the question set open.
- one probe, one question; do not bundle.
do not
- validate a finished build; validate the question before and the change after.
- treat internal opinion as a substitute for contact with a real visitor.
- run a probe whose result cannot change the next decision.
- stockpile discovery insights in a doc nobody rereads; feed them to prioritization weekly.
verification
review the last month: at least one probe per week (or the cadence the product stage warrants), each probe's question and answer written, at least one prioritization decision citing a probe. a calendar with no contact is the failure mode this file exists to prevent.
good and bad
bad
assumption: power users will compete on workflow speed.decision: build a live leaderboard feature (6 weeks).result shipped: leaderboard shows; 0.3% of users ever visit it.post-mortem: "users don't care about competition."cost: 240 person-hours for a feature nobody wanted.
validated after six weeks of work. a one-hour conversation with three power users would have surfaced the truth: they don't want public comparison; they want to improve their own workflows.
good
hypothesis: power users might engage more if they see others' speeds.probe: one conversation with three active power users."would you compete on workflow speed? why or why not?"answers: all three said no. they prefer private improvement metrics.result: hypothesis false.next: instead, test private performance tracking against public.cost: 1 hour + insight, no wasted build time.
the cheap probe falsified the assumption before building; the same hour surfaced private performance tracking as the next iteration's higher-confidence item.